РЕЗЕРВНАЯ КОПИЯ САЙТА!

Вы можете ПЕРЕЙТИ на ОСНОВНУЮ версию сайта






Company Engineering

[videox src="upload/docs/2015/1426412874_1_The_engineering_solutions_offered_by_NPO_Saturn_(2013,_November).mp4" img="img/editifr/2015/124_0_s1.jpg"]
The engineering solutions offered by UEC-Saturn (video) ⇒
[/videox]
Engineering services

UEC-Saturn, based on its long-term experience in preproduction and ramping-up of one of the most complicated technology (gas-turbine engine), offers a wide range of engineering services.

UEC-Saturn is experienced in all design and technological preproduction works, it provides a package of engineering services as a unitary end-to-end project aimed at increase of manufacturing process reliability and reduction of production costs.


[imgx class="block" src="img/editifr/2015/124_0_s2.jpg"]
Engineering service package

• development of technological processes for equipment of the Customer

• development and introduction of control programs for the CNC machines

• optimization of processing by selection of the cutting tools, cutting modes

• designing and manufacturing of tooling and tools (jigs, fixtures, tools)

• process introduction in manufacture

• selection and acquisition of the full nomenclature of the cutting and measuring tools of domestic and foreign manufacturers


[imgx class="block" src="img/editifr/2015/124_0_s3.jpg"]
How to place an order

At the stage of pre-contract preparations the UEC-Saturn specialists are ready for visiting the Customer for getting acquainted with the available equipment, the existing nomenclature of parts, technological processes, and scope of works.

Please, fill-in the questionnaire below and send it to e-mail: dmitry.belov@npo-saturn.ru for preliminary order planning and estimation.

Questionnaire (UEC-Saturn) ⇒

Within three days our specialist will contact you.


Contacts

Dmitry V. Belov
Head of Engineering Program
Phone: +7 (4855) 292-395
E-mail: dmitry.belov@npo-saturn.ru


IMAGE GALLERY



[ Go to gallery... ]


HIGHLIGHTS

CURRENT NEWS

23 October    - UEC presented the company’s industrial model transformation program ...
[ More... ]


LATEST NEWS ABOUT US

LAST UPDATED

  • Current news - 13.11.2018
  • - 9.11.2018
  • Company structure - 9.11.2018
  • Coordinates - 1.11.2018
  • Management - 21.09.2018
  • Engineering - 12.07.2018
  • D-30KU/KP - 26.04.2018
  • Design-experimental base - 25.04.2018
  • Company management - 25.04.2018
  • Quality system - 25.04.2018
  • E70/8RD - 13.04.2018













  • © "UEC-SATURN" 2006-2012 , Powered by SprinCMS 2.62